Skip to content

Risk Register

Knowledge failures often preserve valid-looking records while corrupting what readers are allowed to infer. The risk surface spans identity, source custody, relationship direction, uncertainty, reconciliation, coverage, and downstream interpretation.

flowchart LR
    S["source and version"] --> E["evidence record"]
    E --> C["claim"]
    C --> G["relationship graph"]
    G --> H["review handoff"]
    X["contradiction or ambiguity"] --> G

Scientific And Custody Risks

Risk Observable failure Required control
identity ambiguity one symbol resolves to the wrong protein, species, or isoform namespace, organism, version, and ambiguity status
source drift a database or ontology changes without a retained version source release and retrieval provenance
citation decay source is retracted, moved, or no longer supports the claim citation context, freshness review, explicit invalidation
relationship inversion supports/refutes, drug/target, kinase/substrate, or parent/child direction reverses typed directed edges and asymmetric tests
evidence laundering derived interpretation is stored as primary evidence evidence class and derivation lineage
contradiction erasure reconciliation drops a dissenting record retain competing evidence and resolution rationale
confidence conflation source confidence becomes claim or decision confidence separate confidence dimensions and owners
reconciliation instability input order changes the resolved record deterministic resolution and retained alternatives
graph corruption dangling, duplicate, or unreachable evidence enters memory graph-integrity validation
coverage overclaim “not represented” is read as “biologically absent” denominator, source scope, and unresolved set
schema drift old persisted evidence changes meaning on load compatibility evaluation and migration evidence
review-state divergence a brief no longer matches canonical stored evidence content fingerprint or regeneration check
redistribution error external content is shipped beyond its license source-specific licensing and distribution boundary
downstream reinterpretation consumers assign new meaning to canonical fields typed handoff contracts and cross-package tests

Review Priority

Prioritize failures that change meaning without breaking serialization: namespace defaults, relationship direction, source versions, uncertainty coercion, and reconciliation policy. Test contradictory evidence, unresolved identifiers, stale sources, duplicate relationships, empty coverage, and old serialized records.

A trustworthy handoff preserves not only the accepted record but also why it was accepted, what competed with it, and which uncertainty remains.