Skip to content

Risk Register

Index owns the truth of an execution claim. A neighbor list is insufficient: the request, vector geometry, capability decision, backend identity, budget, ranking, lifecycle status, and artifact must describe one execution. Plausible results assembled from mismatched generations are a high-severity failure.

Trust Chain

flowchart LR
    corpus["corpus and vectors"] --> plan["immutable plan"]
    plan --> capability["capability resolution"]
    capability --> execution["backend execution"]
    execution --> ranking["score and tie policy"]
    ranking --> commit["lifecycle commit"]
    commit --> artifact["artifact and provenance"]

    corpus -. "geometry drift" .-> ranking
    capability -. "fallback drift" .-> artifact
    execution -. "state drift" .-> artifact
    commit -. "partial finalization" .-> artifact

Persistent Risks

Hazard Severity Detection signal Required control Residual owner
vector dimension, metric, or normalization is mislabeled critical ingestion contract differs from plan or exact-baseline scores shift abruptly bind dimension, metric, normalization, model identity, and corpus fingerprint to the plan embedding producer
backend claims a capability it does not honor critical conformance probe or execution evidence contradicts the capability report validate capability before execution; refuse dishonest or unsupported fallbacks adapter owner
an ANN fallback is presented as exact critical artifact execution contract, approximation report, and selected backend disagree require explicit fallback policy and retain the actual path application owner
tie ordering or floating-point behavior drifts high result IDs change while scores are equal or near the tie threshold canonical secondary ordering; compare score and result fingerprints backend owner
native index or remote state drifts after planning high runner, vector, parameter, native-artifact, or service fingerprint changes verify identity immediately before execution and replay; rebuild or refuse on mismatch storage operator
estimated budget is treated as a hard resource limit high host time or memory exceeds policy while package counters remain within bounds enforce infrastructure limits separately; preserve package budget classification deployment operator
budget exhaustion is returned as normal top-k critical requested k, returned count, completion status, and refusal/partial reason do not reconcile make completion class mandatory at every consumer boundary API consumer
transaction commits only part of the execution generation critical run status, result, ledger, and native artifacts reference different identities stage one generation, verify it, then atomically publish the generation pointer persistence owner
idempotency key is reused with different normalized intent high the same key maps to more than one request fingerprint bind key to normalized request identity and reject conflicts client owner
tenant or authorization scope leaks across runs critical result or mutation references a resource outside the authorized scope authorize normalized intent and resources; run cross-tenant isolation checks service operator
provenance contains vectors, credentials, or topology secrets critical artifact schema or redaction scan finds restricted fields allowlist retained metadata; store secret references rather than values data controller
replay compares against missing external state high artifact identity exists but the referenced backend generation cannot be resolved retain immutable backend snapshots or label the execution non-replayable deployment operator
compatibility command is mistaken for the canonical API medium new automation depends on compatibility-only output or flags publish Python/HTTP schemas as authority and isolate compatibility tests integration owner

Result Acceptance

flowchart TD
    result["candidate result"] --> lifecycle{"run complete?"}
    lifecycle -->|no| reject["reject result"]
    lifecycle -->|yes| identity{"plan and backend identities match?"}
    identity -->|no| reject
    identity -->|yes| failure_class{"completion class explicit?"}
    failure_class -->|no| reject
    failure_class -->|refused or partial| constrained["handle as constrained evidence"]
    failure_class -->|complete| quality{"quality gate applicable?"}
    quality -->|failed| reject
    quality -->|passed or not required| accept["accept with artifact"]

Consumers must branch on lifecycle and completion class before inspecting the neighbors. A partial result may be useful, but only when its exhausted dimension, actual cost, returned count, and approximation report travel with it.

Evidence Required By Change

  • Vector-law or scoring changes require dimension, normalization, metric, tie-break, canonicalization, and exact-baseline evidence.
  • Adapter changes require capability honesty, transaction, isolation, concurrency, corruption, and cross-backend conformance evidence.
  • ANN changes require exact-versus-approximate quality comparison, parameter and native-index identity, budget exhaustion, randomness, and replay evidence.
  • Artifact or lifecycle changes require interrupted-finalization, incompatible schema, missing state, tamper, and golden replay scenarios.
  • Interface changes require strict request validation, refusal mapping, authorization, redaction, idempotency, and schema snapshots.

The package can expose and refuse unsafe states; it cannot operate backups, configure remote tenancy, pin native libraries, or select an acceptable recall threshold for a domain. The residual owner must close those controls before a deployment claims reproducible retrieval.

See known limitations for unsupported claims and architecture risks for failure mechanisms.