Rollout Safety

A safe rollout preserves service admission, data availability, security posture, and recovery authority while the running release changes. Atlas makes these expectations profile-specific through ops/k8s/rollout-safety-contract.json.

Profile Safety Modes

Profile Delivery mode Warmup required Network policy HPA
ci Deployment no disabled disabled
dev Deployment no disabled disabled
kind Rollout yes cluster-aware disabled
offline Deployment yes disabled disabled
perf Rollout no cluster-aware enabled
prod Rollout no cluster-aware enabled

Every profile requires a readiness path. Kind requires warmup before promotion; offline requires prewarming and pinned datasets while forbidding live-catalog readiness. Performance requires a digest-pinned image and service monitoring. Production requires HPA and cluster-aware dependency isolation.

Workload Parity Gate

Atlas can render either a Kubernetes Deployment or an Argo Rollout. These are different workload implementations, not interchangeable names. Before using a rollout-enabled profile, prove that its rendered pod template includes the same required runtime contract as the approved Deployment baseline:

  • command and image digest;
  • ConfigMap, Secret, and explicit environment sources;
  • startup, readiness, and liveness probes;
  • container and pod security contexts;
  • cache, temporary, audit, and configuration volumes;
  • service account, resource requests and limits, scheduling, and priority;
  • drain configuration and termination grace period;
  • labels and annotations consumed by Services, monitors, and policies.

The checked-in Rollout template is a separate render path and currently exposes a smaller pod surface than the Deployment template. A successful Helm render therefore does not establish workload parity. Treat a rollout-enabled render as non-promotable when any required field above is absent, even if the Argo controller accepts it. Use a Deployment profile until the selected Rollout render proves the complete contract.

Promotion State Machine

stateDiagram-v2
    [*] --> Preflight
    Preflight --> Deploying: render and contracts pass
    Preflight --> Rejected: contract failure
    Deploying --> Observing: new instances become ready
    Deploying --> Rollback: readiness or warmup fails
    Observing --> Promoted: service and load evidence pass
    Observing --> Rollback: SLO, error, policy, or integrity regression
    Rollback --> Recovered: previous release is ready
    Rollback --> Incident: recovery contract fails

Do not promote on pod phase alone. Promotion requires readiness to stabilize, traffic to reach the new release, expected telemetry to arrive, and the selected load or resilience evidence to remain inside budget.

The default canary sequence declares weights of 10% and 50%, with pauses of 60 and 120 seconds. The checked-in Rollout does not declare trafficRouting, stableService, canaryService, or an analysis template. Its weights therefore must not be described as proof that exactly those request fractions reached the candidate. A profile must measure the actual candidate request share and allow enough request volume and time to exercise cheap, heavy, error, and dataset-resolution paths. Low traffic may require longer pauses or synthetic probes to produce meaningful evidence.

Prove the Traffic Split

Without a traffic router, canary weight is implemented through replica proportions and a shared Service can distribute requests unevenly because of connection reuse, endpoint readiness, topology, and client behavior. Preserve both controller intent and observed routing:

Evidence Required identity
desired canary state Rollout revision, declared weight, replica counts, and pause interval
eligible endpoints pod UID, release identity, readiness interval, and Service membership
actual requests candidate and stable request counts by route class and observation window
decision quality minimum sample, latency and error comparison, saturation, and missing-signal treatment
flowchart LR
    Weight[Declared canary weight] --> Replicas[Stable and candidate replicas]
    Replicas --> Endpoints[Ready Service endpoints]
    Endpoints --> Requests[Observed requests by release]
    Requests --> Compare[Route-class comparison]
    Compare --> Decision{Promote, hold, or abort}

If release-scoped request counts cannot be obtained, the rollout can exercise availability but cannot support a percentage-based canary claim. Record that limitation and use a separately addressable candidate path or another delivery mode with observable routing.

Join the Candidate Evidence

Controller state, endpoint eligibility, and request telemetry must identify the same candidate. A timestamp-only correlation is too weak when pods restart, Services change membership, or a rollout revision is retried.

flowchart LR
    Render["Rendered template digest"] --> Revision["Rollout revision"]
    Revision --> Pod["Pod UID and image digest"]
    Pod --> Endpoint["Endpoint membership interval"]
    Endpoint --> Request["Release-scoped requests"]
    Request --> Decision["Promotion observation window"]
Join Required key What it excludes
render to revision template digest and controller revision a controller accepting a different pod contract
revision to pod pod UID, image digest, and configuration identity stale or replaced candidates
pod to endpoint pod UID and readiness membership interval requests attributed outside traffic eligibility
endpoint to request release identity, route class, and request timestamp stable traffic hidden inside candidate totals
request to decision observation-window identity and evidence digest post-hoc metric selection from another interval

If any join is missing, narrow the result to the last established boundary. For example, eligible candidate endpoints prove rollout availability; they do not prove representative requests executed on the candidate.

Decision Gates

Gate Required state Failure action
preflight versions, digests, values, render, policy, and rollback target resolve reject before mutation
admission workloads schedule with intended identity, security, and dependencies hold or remove candidate
readiness candidate completes profile-specific startup and enters endpoints roll back or diagnose readiness
traffic representative request classes reach the candidate hold; do not infer behavior from idle pods
observation correctness, latency, errors, saturation, and telemetry remain acceptable drain candidate and roll back
recovery previous release restores traffic and dataset behavior escalate to incident response

Each gate has a different rollback cost. Rejecting at preflight avoids cluster mutation. Failing after traffic shift requires preserving candidate-scoped signals before draining it. Recovery failure ends the routine rollout path.

Protect Capacity During Overlap

For a candidate fraction (w), observed candidate request rate should be close to (w \times R), where (R) is the total request rate for the same route class. Use this check to prove that service routing actually exercised the candidate. Compare per-release counts rather than assuming the controller's declared weight became traffic.

Rollout overlap consumes old and new capacity simultaneously. Check that:

  • the cluster can schedule the peak combined replica set;
  • PDB and controller availability rules do not deadlock progress;
  • HPA signals distinguish candidate saturation from aggregate fleet health;
  • cache warmup does not exhaust store, network, memory, or ephemeral-storage budgets;
  • termination grace exceeds the server drain requirement and any in-flight request deadline.

Do not reduce old capacity until the candidate has both readiness and representative traffic. A ready but cold candidate can shift load into store fetches and fail only after the previous replicas have already drained.

Observe During Change

Track at least:

  • ready, live, draining, and overload states by release identity;
  • request rate, error rate, latency distributions, and heavy-work shedding;
  • restart, scheduling, image-pull, and dependency failures;
  • warmup and catalog discovery progress where required;
  • HPA decisions, replica availability, and PDB constraints;
  • audit, authentication, and network-policy failures;
  • store integrity and dataset-resolution errors.

Compare the new and previous releases over the same observation window. A global average can hide a failing candidate behind healthy old replicas.

Every request, metric, log, and trace used for a promotion decision needs a candidate or baseline release identity. If route-level signals cannot be split by release, the canary is not observable enough to support promotion.

Rollback Triggers

Begin rollback when the candidate cannot become ready within the declared window, loses required policy or configuration, violates latency or error budgets, cannot resolve governed datasets, or causes cheap-path survival to fail under load. Also roll back when required telemetry is absent: an unobservable candidate is not safe to promote.

Stop automatic rollback and escalate to incident response when the previous release cannot recover, shared data or catalog state may be damaged, or the rollback would violate a known compatibility boundary.

Rollback is not safe when the previous runtime cannot consume the current configuration, catalog, or dataset state. Resolve those compatibility directions during preflight. If shared state changed unexpectedly, freeze the state and investigate rather than cycling releases.

Isolate the Rollout Decision

A rollback can restore a workload revision; it cannot reliably undo an unrelated catalog promotion, credential rotation, admission-policy change, or storage mutation. Freeze independent control-plane changes from preflight until the release is promoted or recovered. This preserves one causal change and one usable rollback target.

Concurrent change Default during rollout Exception proof
catalog or dataset publication freeze the active pointer and published object set publication is the explicit release subject and both compatibility directions are proven
credential or trust-root rotation keep overlap credentials valid old and new releases authenticate throughout overlap and revocation has a separate gate
NetworkPolicy or admission policy freeze policy revision policy change is isolated in the rendered diff and denial telemetry is release-scoped
autoscaling policy or resource limits keep the approved capacity model the rollout is the capacity experiment and abort thresholds account for overlap
cache purge or store maintenance defer until recovery is complete the action is required to recover and its store-load budget is independently bounded

If an emergency change breaks this freeze, record its exact time and identity, hold promotion, and restart the observation window after the system reaches a known state. Do not attribute a clean aggregate metric to the candidate when multiple authorities changed underneath it.

Prove Every Reversal Boundary

“Roll back” can name several different actions. Record which authority changed and prove its reversal independently:

Changed authority Reversal action Completion evidence
workload revision restore the approved image and pod template old revision serves representative traffic with expected probes and signals
runtime configuration restore prior values and restart every affected process rendered digest, pod environment and behavioral checks match the prior receipt
catalog pointer restore the prior promoted dataset tuple catalog and identity-bearing query agree on the restored release
immutable store availability restore access to the previously verified payload checksum and deep-read checks succeed through the serving path
credential or trust material restore overlap credentials or complete the intended rotation old and new authentication paths have explicit acceptance or revocation results
network or admission policy restore the approved policy revision required flows succeed and forbidden flows remain denied

A workload controller can reverse only the first row. If the incident crosses another row, routine automatic rollback is incomplete even when pods become ready. Freeze mutation, preserve the candidate evidence, and transfer control to the recovery or incident process until every changed authority has a known final state.

After reversal, repeat the same representative query, dataset identity, telemetry, and capacity checks used before the change. Recovery is demonstrated behavior, not the controller's RolledBack label.

Required Record

Preserve the baseline and target release identities, selected profile, rendered diff, conformance report, rollout timestamps, probe transitions, relevant metrics and traces, rollback decision, and final service state. For an upgrade or rollback claim, the install matrix must also declare the corresponding lifecycle scenario.

Close the record with one of four explicit outcomes: promoted, recovered to the previous release, escalated with shared authority frozen, or incomplete. The last observed controller state is not a decision outcome, and a timed-out evidence join must remain incomplete rather than being inferred from healthy aggregate traffic.

See Health Readiness and Drain for endpoint semantics and Rollout Under Load for traffic evidence.