Risk Register¶
The risk register tracks high-impact DAG risks, their signals, and mitigation expectations.
Visual Summary¶
flowchart LR
risk[identify risk] --> signal[define leading signal]
signal --> mitigation[assign mitigation]
mitigation --> verify[verify effectiveness]
verify --> reassess[reassess risk level]
Active Risk Themes¶
- replay and diff semantic drift without explicit policy updates
- artifact integrity regressions under backend or concurrency changes
- environment-sensitive behavior reducing reproducibility confidence
- documentation drift that misguides operator decisions
Mitigation Expectations¶
- contract tests for replay/diff and integrity-sensitive surfaces
- explicit compatibility notes for behavior-affecting changes
- diagnostics quality checks in failure and downgrade pathways
- documentation updates in the same change set when behavior changes